Ökmen, & and Öztaş, A (2008) Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model. Journal of Construction Engineering and Management, 134(01), 49–63.

Cui, Q, Johnson, P, Quick, A and Hastak, M (2008) Valuing the Warranty Ceiling Clause on New Mexico Highway 44 Using a Binomial Lattice Model. Journal of Construction Engineering and Management, 134(01), 10–17.

Hassan, M M and Gruber, S (2008) Simulation of Concrete Paving Operations on Interstate-74. Journal of Construction Engineering and Management, 134(01), 2–9.

Khalafallah, A and El-Rayes, K (2008) Minimizing Construction-Related Security Risks during Airport Expansion Projects. Journal of Construction Engineering and Management, 134(01), 40–48.

  • Type: Journal Article
  • Keywords: Optimization; Evolutionary computation; Security; Airport construction; Site evaluation; Site preparation, construction; Construction management; Risk management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(40)
  • Abstract:
    Airport expansion projects often require the presence of construction personnel, material, and equipment near airport secure areas/facilities, leading to an increase in the level of risk to airport security. Construction planners and airport operators need to carefully study this challenge and implement active measures in order to minimize construction-related security breaches and comply with all relevant Federal Aviation Administration guidelines. This paper presents the development of an advanced multiobjective optimization model for planning airport construction site layouts that is capable of minimizing construction-related security breaches while simultaneously minimizing site layout costs. The model incorporates newly developed criteria and performance metrics that enable evaluating and maximizing the construction-related security level in operating airports. The model is developed using a multiobjective genetic algorithm, and an application example is analyzed to demonstrate the use of the model and its unique capability of generating a wide spectrum of optimal trade-offs between construction-related airport security and site layout costs.

Liou, F and Huang, C (2008) Automated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk. Journal of Construction Engineering and Management, 134(01), 18–24.

Lu, M and Lam, H (2008) Critical Path Scheduling under Resource Calendar Constraints. Journal of Construction Engineering and Management, 134(01), 25–31.

Seo, J W and Choi, H H (2008) Risk-Based Safety Impact Assessment Methodology for Underground Construction Projects in Korea. Journal of Construction Engineering and Management, 134(01), 72–81.

Stoy, C, Pollalis, S and Schalcher, H (2008) Drivers for Cost Estimating in Early Design: Case Study of Residential Construction. Journal of Construction Engineering and Management, 134(01), 32–39.

Xue, X, Shen, Q, Wang, Y and Lu, J (2008) Measuring the Productivity of the Construction Industry in China by Using DEA-Based Malmquist Productivity Indices. Journal of Construction Engineering and Management, 134(01), 64–71.